PROGRAMS / 1000 POUND CLUB

Powerbuilding Program Guide

Powerbuilding usually means training for both strength and muscle size. It is not one standardized program or a separate judged sport. Brandon Campbell’s publicly available PHUL routine is a concrete example: two power-focused sessions and two hypertrophy-focused sessions in an upper/lower split. Use its structure to understand the tradeoffs, then record how your main lifts and assistance actually progress.

THE SHORT VERSION

Choose a named routine with explicit work and progression, then separate main-lift performance from assistance progress. More exercises do not automatically improve a powerlifting total.

Separate the goal from the program label

Powerlifting competition ranks accepted squat, bench and deadlift results. Bodybuilding judging concerns physique presentation. A hybrid training goal can value both a stronger barbell performance and muscle development without entering either sport. The word powerbuilding does not tell you the frequency, rep ranges, exercise selection or recovery cost of a specific week; those details still have to be written down.

The ACSM’s 2026 overview treats muscle function, hypertrophy and physical performance as related but distinct outcomes. That supports tracking more than one outcome, not a claim that PHUL has been proven superior to every other routine. A bigger assistance lift, a better-looking physique and a higher judged total are different records. Choose which one is the current priority when they compete for time or recovery.

Sources: ACSM 2026 resistance-training position stand

The public PHUL example

Brandon Campbell’s four-day structure, with our example weekdays
DayEmphasisMain and supporting work
MondayUpper powerBench and row at 3–4 × 3–5; incline DB bench, pulldown, press and arm work
TuesdayLower powerSquat and deadlift at 3–4 × 3–5; leg press, leg curl and calves
ThursdayUpper hypertrophyIncline barbell bench, DB fly, cable/DB rows, lateral raise and arms; mostly 3–4 × 8–12
FridayLower hypertrophyFront squat and lunge at 3–4 × 8–12; leg extension/curl 3–4 × 10–15; calves

This is a role map of the source, not a reproduction of its complete exercise sheet. Follow the linked public routine for every exercise’s range. Its notes advise beginning at the lower volume end and leaving at least one rep available rather than abusing failure. The original routine keeps the main compounds, with appropriate like-for-like changes for assistance. You need the equipment and skill for the selected movements.

Sources: Brandon Campbell: PHUL on Muscle & Strength

What the two types of day are doing

Keep exercise roles and outcomes visible
RolePHUL exampleUseful recordWhat it cannot prove
Heavier compound practiceBench, squat, deadlift or row on power daysLoad, all reps and executionA planned increase is not a new single
Higher-rep compound workFront squat or incline benchRep range, load and techniqueA variation record is not the competition lift
More targeted assistanceLeg curls, lateral raises or arm workExercise, load and controlled repsAn improvement does not guarantee main-lift transfer

PHUL’s lower power day puts squat and deadlift together. That is a meaningful demand, particularly if both are unfamiliar or already near the limit of what you can recover from. Its hypertrophy days are not recovery days merely because the reps are higher. Look at the whole week before adding more work for an individual body part.

For a competition priority, preserve practice of the required lift and execution standard. Incline bench training does not by itself establish proficiency with a paused flat bench and commands. A useful hybrid block can later be followed by more meet-specific planning without claiming that every training phase must look like competition day.

Separate the published ranges from your load rule

The public PHUL page supplies set/rep ranges and progressive-overload principles, but it does not provide one complete automatic loading algorithm for every exercise and missed session. Do not attribute a spreadsheet’s fixed weekly additions to Campbell unless your selected version actually gives them. Write down the implementation you or your coach choose before using the routine as a fully specified plan.

Our illustrative double-progression rule for one exercise, not an additional PHUL rule
ExposureChosen workCompletedNext decision
1Bench 3 × 3–5 at 135 lb5, 4, 3Keep 135; build reps within range
2Same5, 5, 5 with intended reserveConsider a loadable small increase
3140 lb for 3 × 3–54, 3, 3Keep 140; do not add sets simultaneously

The example chooses three sets, within the source range, and a 5 lb total step. It is our illustration of a predeclared rule rather than a universal prescription. A hypertrophy movement can use the same logic with its own rep range and smaller equipment steps. Keep the records separate, and reduce the demand if the chosen increase makes the bottom of the range unavailable.

Sources: Brandon Campbell: PHUL on Muscle & Strength

Print a weekly plan with a specific review point

Our printable planner has four day headings, a field for the routine/version and main-lift priority, and separate planned/completed columns. It leaves individual exercises and loads blank so it does not quietly replace the public PHUL sheet or present our example loads as your program. Print it alongside the original routine, or save it as a PDF using the browser’s print menu.

At the start, choose one review question: can you complete the selected lower-end workload with consistent reps and suitable recovery? Keep attendance, rep performance and fatigue notes rather than demanding a new maximum every week. If a day consistently overruns the available time, identify which work is displacing the priority instead of shortening all rest intervals without recording it.

When the hybrid workload stops fitting

Suppose the lower power day repeatedly loses its deadlift work after long squat sets, while the Friday leg session is completed. That suggests a scheduling or workload problem worth reviewing. It does not establish that the deadlift needs several new isolation exercises. First determine whether the prescribed rest, starting loads and initial number of sets were realistic for the person following the routine.

Change one major demand at a time when possible. Moving a session, choosing the lower listed set count or changing an assistance selection gives a clearer test than simultaneously adding another day and a harder diet. A routine that requires four visits is not a good match if you can reliably attend only two. Compare a complete schedule with the time you actually have.

Choose metrics for both sides of the goal

For strength, keep comparable work sets, effort and occasional appropriately planned tests. For size, choose a consistent record you are comfortable using, such as body-mass trend and standardized measurements, rather than treating one day’s pump as new tissue. Both types of record have noise. Neither tells you that one accessory caused the change without controlling the other things that changed too.

A clear hybrid plan names the main lifts, supporting work, progression and what gets reduced when recovery is limited. Use the volume/intensity guide to describe the dose and the accessory worksheet to explain why each extra movement is there. The purpose is a repeatable training week with observable outcomes, not the maximum possible list of exercises.

Sources and scope

These references support the specific factual points cited above. The examples and decision aids are original illustrations, not individualized coaching or medical advice.

  • Brandon Campbell: PHUL on Muscle & Strength

    Supports the four-day power/hypertrophy layout, exercise and rep ranges, starting at lower volume and leaving at least one rep available. Our planner and load-progression example are explicitly labeled additions. Checked November 20, 2026.

  • ACSM 2026 resistance-training position stand

    Overview of reviews in healthy adults supporting progressive resistance training and distinguishing strength, hypertrophy and performance outcomes. It does not validate our individual example prescriptions or diagnose a lifter’s plateau. Checked November 20, 2026.

MAKE THE NEXT POUND COUNT

A goal worth keeping track of.

1000 Pound is building a mobile app around your squat, bench, deadlift, and the real singles that make up your total. Coming soon for iOS and Android.

Release news and the current first-year-free offer. No payment details needed.